Kitchen, Bath and Home Remodeling in East Cobb
Level 5 Builders is a residential remodeling and home building contractor serving metro Atlanta, founded in 2023 by Bobby and Jose with 40+ years of combined construction experience. In East Cobb we focus on what the housing calls for. In ZIP codes 30062 and 30068, most homes were built in the 1970s and 1980s, and that age shapes the work: kitchens rebuilt from the studs out, original-era baths, sunrooms and screened porches, finished basements and additions that match the house. Most of East Cobb is unincorporated, so Cobb County handles permitting and zoning. We plan to the County's process from day one.

Photo: our sunroom remodel in nearby Marietta.
What We Build in East Cobb
-
Kitchen remodeling: Opening the closed kitchens common in 1970s and 1980s homes, with the structural work done before the cabinets go in.
-
Bathroom remodeling: Original-era primary baths rebuilt with licensed plumbing and electrical work, which Cobb requires.
-
Home additions: Additions submitted with a survey or site plan, then cleared through County zoning and site plan review.
-
Decks, porches & sunrooms: Decks, screened porches and sunrooms, which Cobb's addition checklist treats as additions to the footprint.
-
ADUs & in-law suites: ADUs and in-law suites. Cobb commissioners voted in October 2026 to allow ADUs in unincorporated Cobb by special land use permit.
-
Basement finishing: Basement finishing, its own category on Cobb's residential permit application.
-
Whole-house remodeling: Whole-house updates that bring 40-to-50-year-old wiring, plumbing and layouts up to date at once.
-
Custom new construction: Teardown-and-rebuild homes, which add County stormwater review and, near the river, corridor review.
Remodeling in East Cobb: What to Know
Cobb County is the permit office
In 2022, East Cobb voters rejected a cityhood referendum by about 73 percent to 27 percent, so most East Cobb homes remain in unincorporated Cobb County. Residential permit applications go to Cobb Community Development, and its residential application lists additions, renovations, basement finishes and accessory structures. Some addresses fall inside a city instead, which then handles the permit, so we confirm the parcel's jurisdiction first.
What an addition submittal needs
Cobb's addition checklist covers anything attached that adds to the home's footprint: decks, patios, porches, sunrooms, rooms and garages. It calls for a recorded survey or plat marked with the addition, or a site plan, plus a drawing of the structure and the contractor's state and business licenses. Septic properties also need Environmental Health approval. Zoning and site plan review follow, and the County's checklist allows up to 10 business days for approvals.
ADUs, the River and Neighborhood Rules
Accessory buildings and new ADU rules
In Cobb's R-20 single-family district, accessory buildings sit behind the house, and anything over 650 square feet must be at least 100 feet from every property line. Architectural style is approved by the zoning division. On October 27, 2026, the Board of Commissioners voted 3-2 to allow ADUs by special land use permit, so each one goes before the Board. The owner must live on the property, short-term rentals are not allowed, and size is capped relative to the main house.
Near the Chattahoochee
Homes within 2,000 feet of the Chattahoochee fall under the Metropolitan River Protection Act. Cobb's code allows single-family homes in the corridor, generally on two-acre lots (older lots of record can qualify), with the zoning division reviewing projects. A teardown-and-rebuild with a pool and deck at an unincorporated Cobb address went through regional MRPA review.
Neighborhood associations
Much of East Cobb's civic life runs through neighborhood groups. The East Cobb Civic Association describes itself as bringing homeowners and associations together and weighing in on zoning and variance cases. If your subdivision has covenants or an architectural review committee, that approval is separate from the County permit, and we build it into the schedule.
Recent Work Nearby
Nearby in Marietta, we remodeled a sunroom for clients who shared a video testimonial. A short drive away in Roswell, we built a vaulted sunroom with a fireplace.
East Cobb Remodeling Questions
Is East Cobb a city? Who issues my permit?
East Cobb is not a city; voters rejected cityhood in 2022. Most homes are in unincorporated Cobb County, which issues building permits through its Community Development Agency. A few addresses are inside a city, which handles those permits.
Can I build an ADU or in-law suite in East Cobb?
Possibly. On October 27, 2026, Cobb commissioners voted to allow ADUs in unincorporated Cobb, but only by special land use permit, so each project needs Board approval. Owner occupancy is required and short-term rentals are not allowed. An in-law suite inside the main house is a different path, which we can review with you.
Does a screened porch or sunroom need a permit in Cobb?
Yes. Cobb's addition checklist names decks, patios, porches and sunrooms as additions to the footprint, with a survey or site plan and zoning and site plan review before the permit is issued.
Is my HOA's approval enough?
No. Covenants and architectural review committees are private approvals. County zoning and building permits are still required, so we plan for both.
Can I build a large detached garage or studio?
In the R-20 district, accessory buildings go behind the house, and those over 650 square feet must be 100 feet from every property line. Other districts have their own limits, so we check yours first.
Plan Your East Cobb Project
Our promise is to deliver work we stand behind: value over cost. If you are planning a kitchen, a bath, an addition, a porch or a new home in East Cobb, start with a walkthrough. We will look at the house, the lot and the approvals that apply, and tell you plainly what we see. Request a walkthrough or call 770-766-4424. Licensed & Insured.

